
UX/UI
Web/Mobile applications
2017/2018/2019
UX/UI
Web/Mobile applications
2017/2018/2019
During the construction phase, BMapp makes it possible to bring order into the documentation for the client and subsequent successful operation phase. BMapp integrates the documentation process for the trades doors and gates, firewall, heating, ventilation, air conditioning or electrical in one project. It successfully using by clients located in Switzerland. You can find more information on Bmapp official page.
We collaborated on an interesting project for BMapp. MM Studio analysed full requirements and developed mobile native applications for iOS and Android. We also developed web application for full maintenance of complete BMapp system. We added a "Manual input" on the main screen of mobile apps. This way, users have the opportunity, even when not on the website, to get the information using QR code.
User-friendly
Defect management by means of image, text and predef. standard text
Ideal system for the client, planner, user, FM, electrician etc.
User customizing
Compatible with iOS
Compatible with Android
Desktop-Software
Log file generation as PDF
Multi User compatibility
For the trades doors and gates, firewall, electrical, HVACS, and much more.
Server located in Switzerland
Offline functionality for floors without internet access.
August 2019 - In the versions Android and iOS the function "Manual input" has been added on the main screen of mobile apps. Thus, users have the opportunity, even if they are not on site, with their mobile device and no QR code to get the information they need. With this function users increases the productivity eg during a session and can get maximum usage of the additional function.
February 2019 - An exciting and interesting project was equipped with the BMapp. Over 2000 doors were opened in the system. Whether planner, user, installer or construction management, all are excited about the user-friendliness and the central information office. The BMapp is used for the installation technology, defect procedures, acceptance procedures during the construction phase. We look forward to the subsequent maintenance phase.